STARBUCKS
This commercial transformation focused on creating a peaceful, natural escape for Starbucks. We installed large 48” box trees, planting, and a the high quality / latest water efficient irrigation system by Hunter. The result is a low-maintenance retreat that feels timeless.
PROJECT OVERVIEW
-
Year completed: 2024
-
Completion Time: 45 Days
-
Project Cost: $130,500
PROJECT HIGHLIGHTS
-
The newest and greatest drop irrigation. Includes remote access and weather adjustments.
-
Professional designed for decades to come.
-
Added native plantings and decorative DG.



Del Mar
Modern curb appeal with lush turf, angular beds, and sharp concrete lines designed to complement the home’s architecture.
This sleek front yard upgrade enhances curb appeal with clean lines and minimalist design. We installed premium synthetic turf for a lush, low-maintenance lawn and added decorative rock beds for contract and drainage. The entryway was restructured with a straight path and concrete accents emphasizing the home’s modern architecture.
PROJECT OVERVIEW
-
Year completed: 2023
-
Completion Time: 120 Days
-
Project Cost: $225,000
PROJECT HIGHLIGHTS
-
Installed synthetic turf and permeable pavers.
-
Rebuilt front walkway with poured concrete.
-
Added architectural lighting for curb appeal.




Poway
An outdoor living space with a custom fire pit, open outdoor area, and paving stones that elevate comfort and style.
This custom backyard transformation blended comfort and functionality with modern finishes. We designed and installed an open lounge area, created a natural round fireplace with beautiful stone surround, and laid a multi-textured paver patio with curved turf inlays. The design creates the perfect space for year-round entertaining.
PROJECT OVERVIEW
-
Year completed: 2024
-
Completion Time: 120 Days
-
Project Cost: $175,000
PROJECT HIGHLIGHTS
-
Installed IPE decking and patio structures.
-
Built custom backyard pickleball court.
-
Add irrigation systems and natural grass for a mini soccer field.





Hardscape
Full front and backyard upgrade with turd, rock beds, and a custom putting green surrounded by softscape borders.
This was a full multi commercial space replacement of all driveways, entrances, ADA parking and parth of travel. SD Exteriors also completed the asphalt grinding and overlay of new asphalt for a turnkey installation. We were also able to maintain all business open during construction.
PROJECT OVERVIEW
-
Year completed: 2025
-
Completion Time: 36 Days
-
Project Cost: $1325,000
PROJECT HIGHLIGHTS
-
Remove and replace commercial concrete, ADA compliant parking.
-
Grind and overlay asphalt. Tack seal and strip.
-
SD Exteriors maintained all business open and operational.