STARBUCKS
​​
This commercial transformation focused on creating a peaceful, natural escape for Starbucks. We installed large 48” box trees, planting, and a the high quality / latest water efficient irrigation system by Hunter. The result is a low-maintenance retreat that feels timeless.
​
PROJECT OVERVIEW
-
Year completed: 2024
-
Completion Time: 45 Days
-
Project Cost: $130,500
​
PROJECT HIGHLIGHTS
-
The newest and greatest drop irrigation. Includes remote access and weather adjustments.
-
Professional designed for decades to come.
-
Added native plantings and decorative DG.



Del Mar
Modern curb appeal with lush turf, angular beds, and sharp concrete lines designed to complement the home’s architecture.
​
This sleek front yard upgrade enhances curb appeal with clean lines and minimalist design. We installed premium synthetic turf for a lush, low-maintenance lawn and added decorative rock beds for contract and drainage. The entryway was restructured with a straight path and concrete accents emphasizing the home’s modern architecture.
​
PROJECT OVERVIEW
-
Year completed: 2023
-
Completion Time: 120 Days
-
Project Cost: $225,000
PROJECT HIGHLIGHTS
-
Installed synthetic turf and permeable pavers.
-
Rebuilt front walkway with poured concrete.
-
Added architectural lighting for curb appeal.




Poway
An outdoor living space with a custom fire pit, open outdoor area, and paving stones that elevate comfort and style.
​
This custom backyard transformation blended comfort and functionality with modern finishes. We designed and installed an open lounge area, created a natural round fireplace with beautiful stone surround, and laid a multi-textured paver patio with curved turf inlays. The design creates the perfect space for year-round entertaining.
​
PROJECT OVERVIEW
-
Year completed: 2024
-
Completion Time: 120 Days
-
Project Cost: $175,000
​
PROJECT HIGHLIGHTS
-
Installed IPE decking and patio structures.
-
Built custom backyard pickleball court.
-
Add irrigation systems and natural grass for a mini soccer field.





Hardscape
Full front and backyard upgrade with turd, rock beds, and a custom putting green surrounded by softscape borders.
​
This was a full multi commercial space replacement of all driveways, entrances, ADA parking and parth of travel. SD Exteriors also completed the asphalt grinding and overlay of new asphalt for a turnkey installation. We were also able to maintain all business open during construction.
​
PROJECT OVERVIEW
-
Year completed: 2025
-
Completion Time: 36 Days
-
Project Cost: $1325,000
​
PROJECT HIGHLIGHTS
-
Remove and replace commercial concrete, ADA compliant parking.
-
Grind and overlay asphalt. Tack seal and strip.
-
SD Exteriors maintained all business open and operational.