STARBUCKS

​​

This commercial transformation focused on creating a peaceful, natural escape for Starbucks. We installed large 48” box trees, planting, and a the high quality / latest water efficient irrigation system by Hunter. The result is a low-maintenance retreat that feels timeless.

​

PROJECT OVERVIEW

  • Year completed: 2024

  • Completion Time: 45 Days

  • Project Cost: $130,500

​

PROJECT HIGHLIGHTS 

  • The newest and greatest drop irrigation. Includes remote access and weather adjustments.

  • Professional designed for decades to come.

  • Added native plantings and decorative DG.

Del Mar

Modern curb appeal with lush turf, angular beds, and sharp concrete lines designed to complement the home’s architecture.

​

This sleek front yard upgrade enhances curb appeal with clean lines and minimalist design. We installed premium synthetic turf for a lush, low-maintenance lawn and added decorative rock beds for contract and drainage. The entryway was restructured with a straight path and concrete accents emphasizing the home’s modern architecture. 

​

PROJECT OVERVIEW

  • Year completed: 2023

  • Completion Time: 120 Days

  • Project Cost: $225,000

 

PROJECT HIGHLIGHTS

  • Installed synthetic turf and permeable pavers.

  • Rebuilt front walkway with poured concrete. 

  • Added architectural lighting for curb appeal.

Poway

An outdoor living space with a custom fire pit, open outdoor area, and paving stones that elevate comfort and style. 

​

This custom backyard transformation blended comfort and functionality with modern finishes. We designed and installed an open lounge area, created a natural round fireplace with beautiful stone surround, and laid a multi-textured paver patio with curved turf inlays. The design creates the perfect space for year-round entertaining.

​

PROJECT OVERVIEW

  • Year completed: 2024

  • Completion Time: 120 Days

  • Project Cost: $175,000

​

PROJECT HIGHLIGHTS

  • Installed IPE decking and patio structures.

  • Built custom backyard pickleball court.

  • Add irrigation systems and natural grass for a mini soccer field.

Hardscape

Full front and backyard upgrade with turd, rock beds, and a custom putting green surrounded by softscape borders.

​

This was a full multi commercial space replacement of all driveways, entrances, ADA parking and parth of travel. SD Exteriors also completed the asphalt grinding and overlay of new asphalt for a turnkey installation. We were also able to maintain all business open during construction. 

​

PROJECT OVERVIEW

  • Year completed: 2025

  • Completion Time: 36 Days

  • Project Cost: $1325,000

​

PROJECT HIGHLIGHTS

  • Remove and replace commercial concrete, ADA compliant parking.

  • Grind and overlay asphalt. Tack seal and strip.

  • SD Exteriors maintained all business open and operational.